{"id":4583,"date":"2026-11-25T16:15:48","date_gmt":"2026-11-25T23:15:48","guid":{"rendered":"https:\/\/xenetwork.org\/ets\/?post_type=xen_episodes&#038;p=4583"},"modified":"2026-11-25T16:14:14","modified_gmt":"2026-11-25T23:14:14","slug":"episode-288-extending-the-grid","status":"publish","type":"xen_episodes","link":"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/","title":{"rendered":"[Episode #288] \u2013 Extending the Grid"},"content":{"rendered":"<p>For a century, the bulk power system has grown region by region, with much of it built to handle peaks in demand that happen for a subset of hours each year. The energy transition will certainly need a plan for new grid infrastructure, one that looks beyond its old boundaries, but can we also extend and enhance the current grid to get more out of it, given everything it has inherited?<\/p>\n<p>Guests on this show have brought a range of ideas about the grid of the future, and how it can support the energy transition in better ways than simply repeating the infrastructure of the past. In this episode of our energy transition documentary series, we look at visions of the future grid from Lorenzo Kristov, who pictured a grid built up in layers from local power systems, and Christopher Clack, who modeled a national grid network with high-voltage direct current (HVDC) lines between regions that could cut carbon emissions from electricity without raising its projected cost.<\/p>\n<p>Ideas like these have been under discussion at the national level in the US, this year perhaps more than ever. In March 2026, the US Senate Energy and Natural Resources Committee held a hearing on the \"State of the Bulk Power System.\" There, Liza Reed of the Niskanen Center cited research estimating that, on average, each extra gigawatt of transmission between regions could have been worth about $100 million annually over the past decade. Since then, the Senate has passed a version of the Bipartisan American Affordability and Jobs Act (BAAJA), which would address barriers to siting interstate power lines. As electrification and new loads push demand higher, more renewable generation comes online, and existing infrastructure retires, the debate about our future grid is moving toward a point where critical decisions have to be made to shape the energy transition's future.<\/p>\n<div class=\"ets-featured\">\n<p><strong>Featured in this episode<\/strong>, with titles as they were at the time of each recording:<\/p>\n<p><strong>Public recordings<\/strong>: excerpts from official proceedings:<\/p>\n<ul>\n<li><strong>US Senate Committee on Energy and Natural Resources<\/strong>, hearing \u201cState of the Bulk Power System,\u201d March 25, 2026: Liza Reed, Director of Climate and Energy Policy at the Niskanen Center (currently its Vice President of Policy), testifying, with Senator Mike Lee, the committee\u2019s Chairman, and Senator Martin Heinrich, its Ranking Member<\/li>\n<\/ul>\n<p>The Senate hearing is public domain.<\/p>\n<p><strong>Energy Transition Show episodes<\/strong>: excerpts, in the order we hear them:<\/p>\n<ul>\n<li><strong>Lorenzo Kristov<\/strong>, principal at the California Independent System Operator, on <a href=\"https:\/\/energytransition.show\/10\">Episode #10<\/a> (2016)<\/li>\n<li><strong>Christopher Clack<\/strong>, research scientist at the University of Colorado Boulder, working with NOAA (currently founder of Compounding Energy), on <a href=\"https:\/\/energytransition.show\/29\">Episode #29<\/a> (2016)<\/li>\n<li><strong>Lorenzo Kristov<\/strong>, independent consultant on power system transition, on <a href=\"https:\/\/energytransition.show\/150\">Episode #150<\/a> (2021)<\/li>\n<\/ul>\n<p class=\"ets-sources-link\"><a href=\"https:\/\/xenetwork.org\/ets\/sources\/288\/\">Sources and licenses<\/a> for this episode, including the full recordings, with our excerpt times.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Much of the power grid was built for a few peak hours a year. Can we get more out of it while building the new transmission we need?<\/p>\n","protected":false},"author":3,"featured_media":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[111],"tags":[10,125,18,69,26,115,232],"class_list":["post-4583","xen_episodes","type-xen_episodes","status-publish","hentry","category-energy-transition-show-podcasts","tag-electricity","tag-electricity-grid","tag-energy-transition","tag-grid","tag-renewables","tag-storage","tag-transmission","xen_guests-christopher-clack","xen_guests-lorenzo-kristov"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>[Episode #288] \u2013 Extending the Grid | The Energy Transition Show<\/title>\n<meta name=\"description\" content=\"Much of the power grid was built for a few peak hours a year. Can we get more out of it while building the new transmission we need?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"[Episode #288] \u2013 Extending the Grid | The Energy Transition Show\" \/>\n<meta property=\"og:description\" content=\"Much of the power grid was built for a few peak hours a year. Can we get more out of it while building the new transmission we need?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/\" \/>\n<meta property=\"og:site_name\" content=\"The Energy Transition Show\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@chrisnelder\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/\",\"url\":\"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/\",\"name\":\"[Episode #288] \u2013 Extending the Grid | The Energy Transition Show\",\"isPartOf\":{\"@id\":\"https:\/\/xenetwork.org\/ets\/#website\"},\"datePublished\":\"2026-11-25T23:15:48+00:00\",\"description\":\"Much of the power grid was built for a few peak hours a year. Can we get more out of it while building the new transmission we need?\",\"breadcrumb\":{\"@id\":\"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/xenetwork.org\/ets\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Episodes\",\"item\":\"https:\/\/xenetwork.org\/ets\/episodes\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"[Episode #288] \u2013 Extending the Grid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/xenetwork.org\/ets\/#website\",\"url\":\"https:\/\/xenetwork.org\/ets\/\",\"name\":\"The Energy Transition Show\",\"description\":\"XE Network\",\"publisher\":{\"@id\":\"https:\/\/xenetwork.org\/ets\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/xenetwork.org\/ets\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/xenetwork.org\/ets\/#organization\",\"name\":\"The Energy Transition Show with Chris Nelder\",\"url\":\"https:\/\/xenetwork.org\/ets\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/xenetwork.org\/ets\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/cdn.xenetwork.org\/ets\/wp-content\/uploads\/sites\/2\/2015\/09\/ETS-PodcastArtwork.jpg\",\"contentUrl\":\"https:\/\/cdn.xenetwork.org\/ets\/wp-content\/uploads\/sites\/2\/2015\/09\/ETS-PodcastArtwork.jpg\",\"width\":2500,\"height\":2500,\"caption\":\"The Energy Transition Show with Chris Nelder\"},\"image\":{\"@id\":\"https:\/\/xenetwork.org\/ets\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/chrisnelder\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"[Episode #288] \u2013 Extending the Grid | The Energy Transition Show","description":"Much of the power grid was built for a few peak hours a year. Can we get more out of it while building the new transmission we need?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/","og_locale":"en_US","og_type":"article","og_title":"[Episode #288] \u2013 Extending the Grid | The Energy Transition Show","og_description":"Much of the power grid was built for a few peak hours a year. Can we get more out of it while building the new transmission we need?","og_url":"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/","og_site_name":"The Energy Transition Show","twitter_card":"summary_large_image","twitter_site":"@chrisnelder","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/","url":"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/","name":"[Episode #288] \u2013 Extending the Grid | The Energy Transition Show","isPartOf":{"@id":"https:\/\/xenetwork.org\/ets\/#website"},"datePublished":"2026-11-25T23:15:48+00:00","description":"Much of the power grid was built for a few peak hours a year. Can we get more out of it while building the new transmission we need?","breadcrumb":{"@id":"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/xenetwork.org\/ets\/episodes\/episode-288-extending-the-grid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/xenetwork.org\/ets\/"},{"@type":"ListItem","position":2,"name":"Episodes","item":"https:\/\/xenetwork.org\/ets\/episodes\/"},{"@type":"ListItem","position":3,"name":"[Episode #288] \u2013 Extending the Grid"}]},{"@type":"WebSite","@id":"https:\/\/xenetwork.org\/ets\/#website","url":"https:\/\/xenetwork.org\/ets\/","name":"The Energy Transition Show","description":"XE Network","publisher":{"@id":"https:\/\/xenetwork.org\/ets\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/xenetwork.org\/ets\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/xenetwork.org\/ets\/#organization","name":"The Energy Transition Show with Chris Nelder","url":"https:\/\/xenetwork.org\/ets\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/xenetwork.org\/ets\/#\/schema\/logo\/image\/","url":"https:\/\/cdn.xenetwork.org\/ets\/wp-content\/uploads\/sites\/2\/2015\/09\/ETS-PodcastArtwork.jpg","contentUrl":"https:\/\/cdn.xenetwork.org\/ets\/wp-content\/uploads\/sites\/2\/2015\/09\/ETS-PodcastArtwork.jpg","width":2500,"height":2500,"caption":"The Energy Transition Show with Chris Nelder"},"image":{"@id":"https:\/\/xenetwork.org\/ets\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/chrisnelder"]}]}},"_links":{"self":[{"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/episodes\/4583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/episodes"}],"about":[{"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/types\/xen_episodes"}],"author":[{"embeddable":true,"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/comments?post=4583"}],"version-history":[{"count":3,"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/episodes\/4583\/revisions"}],"predecessor-version":[{"id":4590,"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/episodes\/4583\/revisions\/4590"}],"wp:attachment":[{"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/media?parent=4583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/categories?post=4583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/xenetwork.org\/ets\/wp-json\/wp\/v2\/tags?post=4583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}